Bugsytherooster
Bugsytherooster Bugsytherooster
  • 26-05-2014
  • Mathematics
Answered

To make concrete it takes 8 parts crushed gravel, 7 parts water and 5 parts cement mix. A worker needs to make 220kg of concrete. How much crushed gravel, water and cement mix is needed?

Thanks!!! 

Answer :

Ryan2
Ryan2 Ryan2
  • 26-05-2014
a) 8 + 7 + 5 = 20 parts
b) 220 kg ÷ 20 = 11
c)  8 parts crushed gravel: 8 x 11 = 88 kg
     7 parts water: 7 x 11 = 77 kg
     5 parts cement: 5 x 11 = 55 kg
Answer Link

Other Questions

what is three tenths times two and five sixths
Under the 22nd Amendment what is the maximum time a president may now serve Aone fouryear term Btwo fouryear terms Ctwo fiveyear terms Done twoyear term Etwo si
which has more kinetic energy Tennis ball traveling at 1 msec tennis ball traveling at 2msec tennis ball traveling at3msec tennis ball traveling at 4msec
Write expression as a single logarithm 5 log3x7 log3y
if 8x3x64x then wha does x equal
Mr wallace took 600mg if medicine This was 75 of the full dose What is the full dose
In the United States the Northern economy depended on industry and the manufacturing of goods The Southern economy depended on agriculture and trade The issue o
Two positive numbers have a difference of 17 The larger number is one more than twice the smaller Find the two numbers
Samantha paid 230 pula 6 sales tax for a camera How Much did she pay altogether
La Salle gave France claim to the entire Mississippi River True False